At Granite State ADU, we guide you through every phase of building your ADU from the first shovel of earth to the day you move in. Our goal is a smooth, transparent process with weekly progress updates and timely reports to lenders when financing is involved. Here’s how it works:

1. Site Preparation and Utilities:

We begin with clearing and grading the building area, establishing access, and setting up erosion control. During this stage we install underground utilities such as electric, water, and sewer connections. If city services are available we will connect to them. If the property uses a private septic system, we connect to the existing system according to the septic designer’s specifications and handle all required state and local inspections. Every connection and inspection is fully coordinated by our team so you do not have to manage paperwork or scheduling.

2. Foundation Installation:

Next comes excavation for footings and the foundation, typically a crawl space or full basement as designed. During this phase we install proper footing drains and water-management systems to protect the foundation over the long term. This step also includes the first local building inspection, ensuring the foundation is code compliant and ready for construction.

3. Framing the ADU:

With the foundation approved, we frame the structure including walls, floors, and roof systems. This is when the ADU’s form truly emerges and you can begin to walk through rooms and experience the planned layout.

4. Exterior and Structural Finish Work:

After framing, the exterior shell is completed with roofing, windows, doors, and siding. Interior mechanical, electrical, and plumbing systems are installed and protected as we close the structure. During this stage the ADU starts to feel like a real home, with its full shape, interior volumes, and design details taking final form.

5. Final Site Work and Landscaping:

Once the structure is complete, we focus on the property itself. This includes driveway paving, final grading, hardscaping, and landscaping to integrate your new ADU with the existing home and surroundings.

6. Walkthrough and Handover:

When every checklist item is complete and all inspections have passed, we guide you through a final walkthrough. This is where we answer any remaining questions and officially turn the keys over for move in. Throughout the entire process you can expect:

  • Weekly progress updates with photos and timelines

  • Regular lender documentation when required for draw schedules or construction loans

  • A single point of contact who knows every detail of your project

Granite State ADU manages all logistics including inspections, lender reporting, and scheduling so you can enjoy watching your new ADU come to life without stress.

7. Typical Construction Payment Schedule:

  • 1. Contract Signing – Construction agreement executed
    10% of contract
    • Reserves your build slot and covers initial coordination

  • 2. Permit Approval / Mobilization – Permits secured, site prep begins
    15% of contract
    • Triggers ordering of materials and subcontract scheduling

  • 3. Foundation / Delivery – Foundation complete or modular units delivered
    25% of contract
    • Major structural milestone; inspection required

  • 4. Framing / Rough-Ins – Framing, plumbing, electrical, and HVAC rough-ins complete
    25% of contract
    • Progress draw often reviewed by lender or inspector

  • 5. Finishes / Final Inspection – Interior finishes, fixtures, and final inspection
    20% of contract
    • Home is ready for occupancy

  • 6. Final Walk-Through / Handover – Punch list complete, keys delivered
    5% of contract
    • Final payment after owner sign-off

Construction Process Overview

Got Questions?

The best place to start is by hitting the……

Zoning Analysis Button!

We will NOT spam you, EVER!